Zippy came back on Friday for the insulation inspection and everything went fine. We're OK for the dry wall to go up on Monday.  Thanks Zippy!

As far as the other issue, we've got a tankless gas water heater ordered that should be here on Wednesday so we can get that area buttoned up and forgotten.

Once that was settled, the day belonged to the windows.  A new picture window replaced the faux bay window and a replacement single hung window replaced the tired one that was over the sink.

All in all, a pretty quiet day to end the first full week.  Hopefully by next Friday the dry wall will be up and everything taped & bedded.